Full graphics view| Change low graphics options| Skip to site navigation

Workforce Planning

Numerous examples of innovative thinking now exist within the NHS and typify a new approach to workforce development.

These are characterised by

As new hospitals and other facilities are developed as part of the NHS modernisation programme there needs to be parallel development of the organisation and the workforce to support new models of care. The involvement and engagement of clinicians and other staff is an important factor in the process. Modernising the way services are provided means redesigning roles around the needs of patients and in turn role redesign needs to be linked to robust workforce planning. Staff will be required to review the way they work not only to ensure that the needs of patients are met but also make effective use of their skills

The NHS is charged with providing a high quality service to patients at an acceptable cost. If it is to achieve this goal, it will need the right number of staff with the right skills utilising appropriate technology at the right time.

Workforce planning is the process by which future workforce needs are both assessed and quantified and, because of the time it takes to train staff and the cost involved, a change in the way workforce planning is done throughout the NHS and the DoH is taking place both nationally and locally. This means that there needs to be a greater integration of service, workforce and financial planning and a better understanding of the needs of other health and social care organisations.

Effective, long term planning processes are therefore required at both a national and local level. These processes will minimise the risk of costly shortages (or surpluses) of staff with particular skills and significantly reduce the instances where healthcare provision is sub-standard or delivered at an unacceptable cost. Poor workforce planning, therefore, can have a major effect on health and social care outcomes.

Simple, transparent systems with clear lines of responsibility and full involvement of all key players is required with recognised objectives set out and achievements monitored. The key players include:

Following the Publication of a Health Service of all the Talents (DH 2000) and the new structures put in place following HR in the NHS Plan: more staff working differently (DoH 2002) there are now arrangements that enable bottom up planning, top down planning, patient pathway planning across the whole service and integrated funding arrangements.

In turn it is also recognised that effective long term workforce planning will help to significantly reduce the instances where healthcare delivery is either prevented or delayed due to staff shortages of skilled healthcare workers or delivered at an unacceptable cost.

A project, sponsored by the National Workforce Information and Planning Programme Board on behalf of the National Workforce Group is being developed to inform workforce planning and policy assumptions through the development of more effective long term (with impacts being 10-15 years away) planning processes at a local and national level. Further information can be accessed via www.nationalworkforce.nhs.uk .

There is also recognition that there is a need to apply 'lean thinking', an approach used in manufacturing industries, to healthcare planning and design and what impact it can have on staffing and care delivery. This includes, how can we optimise the use of technology to reduce running costs and how it impacts on the design of buildings for healthcare?

In addition there is a requirement to gather evidence on how technology and service redesign is affecting productivity and enabling staff to take on new roles. Again, for example, the Hospital at Night is one such approach that has been evaluated positively.

It is increasingly being recognised that it is important to acknowledge the links between workforce development and the utilisation of new technologies. The National Programme for IT, for example, will fundamentally change the way staff work on a day-to-day basis, how they interact with patients and where they work. This will require a major programme of IT training as well as a fundamental change in culture. Parallel investments and an integrated approach in both workforce and IT are needed to ensure that there is balance in the overall modernisation programme.

Resources

The Efficiency Map (DH's Productive Time Team) - a document that maps out the key initiatives underway, or in development, to modernise service delivery, pay and workforce strategies, and IT systems within the NHS. For further information go to: Efficiency Map

Connecting for Health - Education and training

Delivering the NHS Improvement Plan - Workforce Contribution

See the NHS Employers website for details on their Large Scale Workforce Change Team

Top of page

Last reviewed 12 Oct 2007

Email to a friend



External links

Office of the Strategic Health Authorities Contains information from the now defunct National Workforce Group and Executive Committee.

Efficiency Map The key purpose of the Efficiency Map is to present initiatives to modernise service delivery, pay and workforce strategies, and IT systems.

Delivering the NHS Improvement Plan - the Workforce Contribution This document highlights strategic workforce issues related to the NHS Improvement Plan.

See also

NHS Employers: Large scale workforce change



Site navigation

Site sections:  Home| About us|Our work|Acute trusts|Ambulance trusts|Foundation Trust Network|Independent sector providers|Mental health trusts|Primary care trusts|Strategic health authorities|Special health authorities|NHS Employers|Across the UK|NHS European Office|Specialist networks|Commercial and not-for-profit

Pages from Specialist networks:  Future Healthcare Network|Health Services Research Network|SDO Network|NHS BME Leadership Forum|Healthcare Facilities Consortium

Pages from Future Healthcare Network:  News|Previous Events|Building Change|Mental Health|System change|Procurement|Workforce and Technology Change|FHN publications

Pages from Workforce and Technology Change:  Medical Equipment

Site options:  Site map|Site A-Z|Help|Contact us|Privacy statement|Accessibility|Terms and conditions|Copyright


A part of the NHS Confederation working on behalf of the NHS

The NHS Confederation (Employers) Company Ltd. Registered in England. Company limited by guarantee: no. 5252407


Copyright © 2009 NHS Employers

A part of the NHS Confederation working on behalf of the NHS

The NHS Confederation (Employers) Company Ltd. Registered in England. Company limited by guarantee: no. 5252407

http://www.nhsconfed.org/specialist/specialist-1654.cfm printed 08 Jan 2009 by 38.103.63.61